Swain Lifting Solutions were tasked with carrying out the Contract Lift of 3no 40m x 40m pre-assembled roof sections for the Baggage Hall at Heathrow Airport, T5c.

Swain Lifting Solutions technical solution was to utilise 4no 100tonne mobile cranes to conduct a complex “quad” lift over 3 night shifts. An excellent example of a full service offering to our client: Right place, right time, capable, compliant, safe!

Specialist lifting, transportation and logistics solutions